  • Which device provides a channel at the intersection of two running rails for wheel flanges to cross?
  • Maximum rail end mismatch for unrestricted operations is 3/16 inch on either side.
  • During inspection, you measure a warp of 2.875 inches. You must _________ or ___________
  • Used rail that is still fit for reuse in track is often referred to as __________.
  • When applying anchors, anchors shall be applied to the gage side of the rail base against the same tie face on opposite rails.
  • String-lining is a method for taking alignment measurements around a curve using a length of string and using an arithmetic procedure to make adjustments to those measurements so that the curve can be smoothly relined. What is the name of this method?
  • Regarding inspecting special features such as turnouts, road crossings and bridges, which statement is correct?
  • Which statement best describes the adequacy of the 8 feet 3 inches horizontal clearance for signs?
  • Ballast helps distribute the load of the track and trains to prevent overstressing which component?
  • When using a single-shoulder tie plate, on which side should the shoulder be placed?
  • Who must be notified in writing that the restrictions have been lifted after repairs?
  • What are the maximum allowed crack length and width on a tie before it is considered inadequate?
  • Which string length provides better accuracy in curve alignment measurements?
  • In hot weather, what condition can occur due to thermal expansion that affects track alignment?
  • How often must drainage structures be inspected and cleaned?
  • An engine burn fracture at 60% requires which restriction?
  • Since traffic volumes on military track are typically not high, ties on military installations more commonly fail from __________ rather than mechanical wear.
  • The Railroad Track Maintenance and Safety Standards apply to railroad track for which organization?
  • A clean complete rail break requires which restriction?
  • The UFC 4-860-03 standards define which maintenance level for Army railroad track?
  • A crosslevel measurement indicating the west rail high requires restricting speed.
  • Select the appropriate operating restriction. Gage measurement of 58 inches in tangent track.
  • Ties shall be installed perpendicular to the rails and___________
  • In curved track, superelevation is applied to the outside rail.
  • Vegetation may be allowed to grow in the ballast section if it does not interfere with train operations, track inspections or safety. True or False?
  • __________ is the relative position of the rails in a horizontal plane.
  • Which gauge measurement yields no operation?
  • If a switch can be thrown and locked in either direction with a gap between point and stock rail of 0.25 to 0.375 inches, the turnout speed must not exceed:
  • When three consecutive defective ties are found, which action constitutes full compliance?
  • Who should perform formal testing and repairs on grade crossing signals?
  • If you must cross the track in the vicinity of a standing car or piece of equipment, you should cross as close to the end of the car or equipment as possible. True or False?
  • Crosslevel refers to the difference in elevation between the top surfaces of which components?
  • The minimum inspection frequencies map as follows: 5 movements per week once a month; 6 movements per month quarterly; 2 movements per year once every 6 months; 35 movements per day once a month. Which option correctly lists these four periods?
  • Electric/electromechanical grade crossing signals shall be inspected no less than how often?
  • Which condition in a rail requires removal and replacement rather than other remedial actions?
  • Gage must be checked in a turnout at each location except the location where the first switch tie is installed.
  • Rail shall be removed from track if base corrodes such that more than ______ inch play is allowed.
  • Lightweight rail is defined in the UFC as rail weighing less than how many pounds per yard?
  • Which gauge measurement in tangent track yields no operation?
  • Maintenance standards require each joint to be bolted with ______ bolts in each rail.
  • Special features such as turnouts, road crossings, and bridges can be inspected without ever leaving the inspection vehicle.
  • A bolt hole crack measures 2 inches. What is the required operating restriction?
  • How is rail end batter measured from the rail end, and which straightedge length is used when laid on the rail being checked?
  • The device that allows wheels running on one track to cross the rail of a diverging track.
  • During routine track inspections, who should perform formal signal testing and repairs?
  • The alignment measurement is the distance in inches from the midpoint of the string line to the gage side of the line rail.
  • During inspection, a wide gauge of 57 7/8 inches is found. The track must be ________ and _________.
  • Signs with a horizontal clearance of 8 feet 3 inches—what is the adequacy?
  • What is the maximum amount of side wear allowed on 100 RE rail section before you impose a speed restriction?
  • Crosslevel is measured perpendicular to the track; which orientation describes how crosslevel is determined?
  • Which of the following is NOT a primary function of ballast?
  • The frog must be restored or replaced when the tread surface is worn more than which amount below its original contour?
  • A freight platform with a 6 feet 6 inches horizontal clearance is adequate. Which option correctly states its adequacy?
  • If switch point tread wear exceeds the specified limits, what action is required?
  • Which component is used to physically place a bent joint bar at its specified position in a switch?
  • On tangent track, can either rail be designated as the line rail so long as the same rail is used for the entire length of the tangent?
  • A sign with a horizontal clearance of 8 feet 3 inches. Which statement about its adequacy is correct?
  • One important defective roadway condition you should inspect for is:
  • Which practice is not recommended according to the material?
  • Water ponding in or near the track at a road crossing will have a detrimental effect on the condition of the track and pavement. This statement is:
  • What device connects the No. 1 switch rod to the switch stand?
  • What type of roadbed is essential to good track maintenance?
  • The gap range of 0.25 to 0.375 inches is the distance between which components?
  • The ballast serves which primary functions?
  • The ballast level beneath the connecting rod, switch point rails, and switch rods should be at least 2 inches below any steel; in snow and ice areas, at least 4 inches.
  • The switch rod bolt connects the switch rod and the
  • For inspection purposes, track standards on a bridge are applied to _________________.
  • Why should spikes not be driven through the slots in skirted-type joint bars (angle bars)?
  • True or False: In curves, the inside rail is designated as the line rail and is used as the reference from which superelevation is applied to the outside rail.
  • If a commercial carrier serving the installation requires a more restrictive standard or criteria not included in the UFC, the installation track shall be maintained to meet the carrier's requirements.
  • When 'peaking' a rail joint, the joint should be given a slight additional lift prior to tamping to compensate for greater compaction that occurs under the joint ties as a result of wheel/rail impact.
  • When shall a condition presenting a hazard to the safe movement of trains be corrected?
  • Dirt and gravel filling the flangeway is permissible.
  • What is the required operating restriction for a gauge measurement of 57 inches?
  • During a track inspection, a dark streak is observed on the field side of the railhead. The static gage reads 57-3/8 inches, and scar marks indicate the outside edge of the plate moving outward by up to 3/4 inch. What is the correct gage measurement?
  • During a bridge inspection, a condition found that could adversely affect operations must be addressed how?
  • A transverse fissure of 35% requires which restriction?
  • During a derailment scenario, the wheel flange cut the tie 1 inch deep across its top; the spikes were pulled up slightly but are still holding. The tie is:
  • Pre-heating and post-heating of rail are not required for rail repair welding since rail has a low carbon content. This statement is:
  • When the degree of curvature is not known, begin at a point near the center of the curve and mark how many station(s) in both directions along the line rail. Measure alignment at each station, including the beginning port, and average the measurements. The average measurement is the approximate ______.
  • Which item is not listed as a special feature to inspect from an inspection vehicle?
  • In turnout terminology, a higher-number turnout is associated with higher speed. Which is the correct interpretation?
  • _________ is a method for taking alignment measurements, around a curve, using a length of string and using an arithmetic procedure to make adjustments to those measurements so that the curve can be smoothly relined.
  • When a rail joint bolt cannot be tightened, what is the required action?
  • Signs have a horizontal clearance of 8 feet 3 inches. Is the clearance adequate?
  • A freight platform 4 feet high has a horizontal clearance of 6 feet 6 inches. Is the clearance adequate?
  • Rail welding requires special techniques and precautions.
  • A rail defect test car detects a head web separation of 3 inches and a transverse fissure 3 feet long. What is the required operating restriction?
  • Which point is included when measuring alignment at each station to determine curvature by this method?
  • It is permissible to fill the flangeways with dirt and gravel.
  • True or False: Once a track is built, you never have to check clearances again.
  • The 'Railroad Track Maintenance and Safety Standards' are to be used for the ______ of Army railroad track.
  • Which hazards are associated with torch cutting of rails due to heat-affected zone and gouges?
  • Rails shall be joined with proper factory designed joint bars and shall not be altered with a flame in any manner, including bolt holes. This statement is:
  • Which statement about pre-heating and post-heating of rail prior to repair welding is correct?
  • During an inspection, particular attention should be given to which group of locations?
  • When road crossings are rebuilt, it is recommended that all ties within the crossing and for how many feet on either side of the crossing be replaced, fully tie plated and picked with how many rail-holding spikes per tie?
  • What is the name of the component that connects the No. 1 switch rod to the switch stand?
  • During a grade crossing inspection, what should be observed besides whistle posts and highway warning signs?
  • Rails of different weight and/or section shall be joined with which of the following methods?
  • Rail welding requires no special techniques or precautions.
  • A vertical split head is a rail defect that is seldom ever visible to the naked eye.
  • The distance between the rail base and the outside shoulder of the tie plate has a bearing on gage measurement.
  • The UFC Track Maintenance and Safety Standards are also good to use for track construction so the work is consistent. True or False?
  • There are a large number of small cracks (checks) covering the top surface of the tie. None of these cracks are more than 3 inches long or ¼ inch wide. Otherwise the tie appears solid and the spikes are holding well. The tie is __________.
  • In a turnout, which rail is the movable element?
  • Which turnout is capable of the higher speed?
  • Rail shall not be ________.
  • When may special inspections be warranted?
  • The switch rod bolt connects the switch rod and the
  • Which observation describes movement of the outside edge of the plate observed in field notes?
  • A main track defect described as head/web separation measuring 4-1/2 inches, with the broken piece of the rail head still present but removable, the track inspector should
  • Which category track contains all active passing tracks, sidings, yard tracks, holding tracks, classification yard or storage tracks?
  • Curve alignment measurements can be made using a long string of what length, and a shorter string of what length may be used for better accuracy?
  • During a turnout inspection, if the top surface of the point rail beyond the taper is about 1/8 inch lower than the top of the stock rail, what action should be taken?
  • When installing the connecting rod bolts and switch rod bolts, where should the nut be placed and what else should be in place?
  • Which of the following represents the correct minimum side wear before a speed restriction is imposed on a 100 RE rail section?
  • A freight platform height of 4 feet has a horizontal clearance of 6 feet 6 inches. What is the adequacy of the clearance?
  • Maintenance standards require switch stands to be fully secured to the head block ties to prevent any unintentional movement of the switch points.
  • Which condition would be described as 'close to traffic' according to typical rail defect restrictions?
  • A 1,500-volt electric wire has a vertical clearance of 26 feet. Is the clearance adequate?
  • The functions of a tie are: distribute load from rail to ballast, maintain surface, maintain gage and __________.
  • The primary purpose of rail anchors is to hold the ties in place.
  • True or False: The statement that 5 movements per week require an inspection once a month is accurate.
  • Which term describes track buckling caused by high temperatures?
  • It is common practice to box anchor each tie on an open deck bridge.
  • Gage is measured
  • Is it permissible to place a spike in the slots of a skirted-type, slotted joint bar?
  • The minimum distance between the centerline of a passing track and the centerline of the adjacent mainline shall be at least how many feet?
  • What is the required operating restriction for a gauge measurement of 56-3/8 inches?
  • Which statement about using a torch to cut or trim track material is correct?
  • Which restriction applies to an engine burn fracture at 60%?
  • T or F? Gage rods are sometimes used to help maintain proper track gage, but are not a substitute for good track maintenance.
  • Which of the following is not a function of a tie?
  • A wood tie sounds hollow when tapped near the rail seat, with spikes loose and field side spikes can be pulled out by hand. The tie is:
  • What action must be taken for a road crossing with a flangeway width of 1-1/2 inches?
  • When maintaining a track that is bonded or grounded, care should be given to maintain the integrity of the ________.
  • What does the following describe: The outside rail of a curve may not be more than 4 inches higher than the inside rail.
  • If a track condition requires an operating restriction, when and how will the restriction be applied by the certified track inspector?
  • Side clearance is measured __________ from the __________ of the track.
  • In the derailment scenario, what depth did the wheel flange cut the tie?
  • Which term describes the intended elevation difference between the outer and inner rails in a curve?
  • What provides lateral support to the stock rails in a turnout?
  • One of the most important functions an inspector must perform before beginning track or turnout inspection is to:
  • The wear threshold for the switch point tread is measured behind the point up to how many inches?
  • Category track contains all active passing track, sidings, yard track, holding track, classification yard or storage track.
  • If a stripped joint with no bolts in one rail is found during an inspection, what action should be taken?
  • A freight platform 4 feet high has a horizontal clearance of 6 feet 6 inches. What is the adequacy of the clearance?
  • How often do you inspect the lowest category of track that is inactive with no mission requirement?
  • If repairs are made to a self-guarded frog without removing it from service, which portion must be rebuilt first?
  • Where are track geometry measurements required during routine track inspections?
  • If a loose joint bar with all bolts loose is found during inspection, which actions are acceptable?
  • If you suspect that a rail is worn more than the allowable limits, at what locations on the rail would you check the amount of wear?
  • A vertical split head 36 inches long and cracked on the gage side requires which actions?
  • True or False: It is critical to repair any defect or deficiency in road crossing warning signs or signals immediately.
  • Using a torch to cut rail or drill bolt holes can create a heat-affected zone that reduces rail strength, and gouges or burrs left behind can act as stress risers that may cause rail failure. This statement is:
  • What are the primary functions of a tie plate?
  • Any condition observed in a road crossing which would cause a hazard should be ______________.
  • During routine track inspection at a grade crossing equipped with signs and signals, the track inspector should observe the condition of all whistle posts, highway warning signs and ________.
  • An internal rail defect inspection is required on all Category A and B tracks every how many years?
  • A wood tie broken through about midway between the center of the track and the rail. The tie is:
  • Should installation track be maintained to a more restrictive standard than UFC 4-860-03?
  • Bolt hole cracks cannot be properly corrected by welding.
  • Which restriction applies to a bolt hole crack of 2 inches?
  • Who applies an operating restriction when required?
  • The certified track inspector is responsible for which of the following?
  • True or False: When nipping or prying with a bar, you should never sit on the bar.
  • Superelevation is the term for the intended increase in elevation of the outer rail.
  • A gap greater than _________ inches is a close- to-traffic defect.
  • Where should the straightedge be placed when measuring rail end batter?
  • Which practice is prohibited when preparing rail joints?
  • If the outside rail is the same height as the inside rail, what is the implied superelevation?
  • If the rail end mismatch exceeds __________ inch, operations shall not be permitted over that location.
  • Bolts shall be installed with bolt heads on the outside of the rail.
  • For inactive or Category C track with no current mobilization, which option is not considered a minimum maintenance activity?
  • What is the recommended action when turnout shows the point rail height not matching the stock rail height by 1/8 inch beyond the taper?
  • Five (5) consecutive ties are found. Impose a __________ or replace at least __________ tie(s) for full compliance.
  • Which statement correctly names the formal standard used for Army railroad track maintenance and safety?
  • For a fence with an 8-foot horizontal clearance, which statement about its adequacy is correct?
  • Which statement best describes the role of gage rods?
  • A switch point gap between ________ and ________ inches requires a speed restriction.
  • Four consecutive defective ties are found in tangent track. The track inspector must impose what speed restriction and replace how many ties for full compliance?
  • Which statement correctly describes the bolt arrangement when using six-hole joint bars?
  • To use single and double shoulder tie plates together, the single must not be cant and the double must be cant.
  • Which statement best describes bar safety when nipping or prying?
  • The correct way to roll a rail is to place the point of the lining bar in one of the bolt holes. True or False?
  • It is not necessary to keep derails clean and painted for visibility and operation as these devices are static and self-actuating.
  • Derails must be kept clean and painted for visibility and operation.
  • Which of the following lengths is the shortest rail length allowed to be installed in track?
  • A fence has a horizontal clearance of 8 feet. Is the clearance adequate?
  • The UFC Track Maintenance and Safety Standards are also good to use for track construction so the work is consistent. True or False?
  • What must happen for a track restriction to be considered removed?
  • A grinder can be used to remove metal flow from a switch point to ensure proper mating of the point and stock rail.
  • T or F? Track bolts cannot be over-tightened in a joint. That is, the tighter the better.
  • Which statement about frogs in turnout maintenance is true?
  • Maintenance standards require a switch point to be restored or replaced when the tread wear exceeds which of the following?
  • The minimum distance between the centerline of a passing track and the centerline of the adjacent mainline shall be at least ______________.
  • Which gauge measurement results in no restriction?
  • When conducting maintenance on a track that is bonded or grounded, care should be given to maintain the integrity of the __________
  • If a fence has an 8-foot horizontal clearance, what is the adequacy of the clearance?
  • What term describes the difference in elevation between the top surfaces of two rails measured at right angles to the track?
  • Select the appropriate operating restriction. Gage measurement of 55-1/2 inches.
  • You are checking superelevation in a curve on a main track and measure the outside rail as 5/8 inch below the inside rail. Is a restriction required?
  • Which restriction applies to a transverse fissure of 35%?
  • For a rail end mismatch of 0.187 inch, what actions must be taken?
  • Washers shall not be permitted between which components?
  • How should a track inspection be performed?
  • The minimum required inspection frequency for Category A and B track is determined by traffic frequency.
  • Where on the line rail is the string placed to take an alignment measurement?
  • An end batter defect of 1/2 inch requires which restriction?
  • Is the vertical clearance of 26 feet for a 1,500-volt electric wire adequate?
  • If a condition on a bridge observed during track inspection might adversely affect train operations, what must the track inspector do?
  • Plate holding (anchor) spikes can help prevent wide gage and also help secure the tie plate to the tie.
  • In the described defect scenario, the appropriate action is to close the track to traffic.
  • Where in a switch is a bent joint bar used?
  • Which item is not part of the standard frog dimensions?
  • Which statement accurately reflects the rail replacement rule when two or more transverse fissures exist?
  • The maximum allowable wear on the guarding face of a self-guarded frog is __________ inch.
  • If a bolt at a rail joint is not tight and cannot be tightened, is it acceptable to leave it in the track since it will hold everything together anyway?
  • When track circuits are installed to detect trains for grade crossing signals, which device is normally used to electrically isolate one rail from the next rail?
  • Which condition is associated with ballast/subgrade pumping indicating drainage problems?
  • If a tie has a large split extending about two-thirds of its length with the rail side completely loose, what is the condition of the tie?
  • ___________ is the intended increase in elevation of the outer rail above the inner rail in a curve.
  • Plate holding (anchor) spikes can help prevent wide gage and secure the tie plate to the tie.
  • Relative to FRA standards, how do UFC 4-860-03 standards typically compare for installation track?
  • All of the following are allowed for the repair of an engine burn fracture less than 40% except:
  • If the joint gap between rail ends exceeds 1-1/4 inch, the operations at that location shall not exceed how many mph?
  • How many consecutive defective ties found on a tangent segment of track will require a speed restriction of 5mph?
  • Which side of the line rail is referred to as the gage side in alignment measurements?
  • Inactive or Category C track with no current mobilization requires all of the following minimum maintenance activities except:
  • Category _____ track contains all active main line track, or other active track with speed greater than 10 mph.
  • In the derailment scenario, what was the status of the spikes?
  • Which end of the frog is closest to the switch points?
  • If road crossing flangeways are packed with soil to a depth of 1-1/4 inch, the required action is to impose a no operations restriction.
  • In a turnout with factory-made compromise joints, different weights and sections of rail are allowed.
  • In road crossing rehabilitation, what does fully tie plated mean for the ties?
  • Which action is the long-term remedy for a rail end mismatch of 3/16 inch?
  • Ballast should be allowed to cover the tops of the ties approximately 2 inches deep. True or False?
  • Which action should be taken if hazard observed at a road crossing?
  • Eight anchors are required on a 39-foot rail section when rail anchors are used.
  • Which obstruction has inadequate vertical clearance?
  • True or False: If you replace a missing switch rod bolt with the correct replacement components, you still have to notify the DPW and close the track.
  • _______________ is the difference in crosslevel between any two points less than 62 feet apart.
  • How is the direction of a turnout determined?
  • What is the purpose of securing switch stands to the head block ties?
  • On track, you must always anticipate the movement of trains, cars or equipment on any track and from any direction.
  • What is the ballast clearance under snow regions?
  • If heavy vegetation interferes with the effective inspection of the track, what should you do?
  • When inspecting paved track areas, external signs of track deterioration include all of the following, except:
  • New ties selected for (the maintenance of) track shall be:
  • A broken base defect measuring 7 inches requires which restriction?
  • For engine house obstructions, vertical clearance 18 ft and horizontal clearance 6 ft 3 in. which clearance status is correct?
  • Select the appropriate operating restriction. Gage measurement of 57-1/4 inches.
  • The statement 'As long as the switch point fits tightly up against the stock rail, it does not matter how much higher the point is above the stock rail at the point' is true or false?
  • Peaking a rail joint before tamping is intended to compensate for greater compaction under which components?
  • What action must be taken for a rail crossing with a flangeway depth of 1 3/8 inches?
  • Which crossing instruction best reflects the proper action when crossing near a standing car or equipment?
  • Single and double shoulder tie plates can be used together provided that the single shoulder plates are not canted and that the double shoulder plates are cant.
  • What helps prevent longitudinal movement of rail?
  • Maximum wear on the guarding face of a self-guarded frog is __________ inch.
  • In a turnout, gauge checking is required at all locations except the location where the first switch tie is installed.
  • A fence is to be built adjacent to the track in a 4 degree curve. What is the minimum distance the fence can be placed away from the centerline?
  • Switches shall be inspected for the following defects except.
  • For a new or rebuilt frog, the standard frog flangeway width is ______ inches and the standard frog flange way depth is ______ inches.
  • Which statement about engine house clearance is correct?
  • The required frequency of inspections decreases proportionally as track conditions improve.
  • If a stripped joint with no bolts is found, what action should be taken?
  • When rail anchors are used, how many anchors should be installed in a 39-foot rail section?
  • Which obstruction has an inadequate vertical clearance?
  • For a No. 10 turnout, guard rails shall be installed with at least_____ inches of the straight guarding face in advance of the frog point.
  • Which statement describes the risk of leaving a minor joint-bar skew unaddressed?
  • The switch stand shall be installed so that when the switch is lined for the main route, the connecting rod keeps the points closed under which type of force?
  • The inspector's duties include reporting deficiencies from which compliance level?
  • What is the correct action when a hazard condition is present on the track?
  • True or False: If a switch point is chipped, broken or worn more than 2 inches down and 12 inches back from the point, it must be replaced.
  • Vertical clearance distances are measured _________ from the _________ of the rail.
  • The shortest length of rail that can be installed in track is ________________.
  • Bolted joints are desirable in road crossings because the bolts can be tightened easily.
  • Which action is required when a warp of 2.875 inches is measured?
  • Ballast restrains the track in which directions under dynamic loads and thermal stress?
  • Grade crossing signal cabinets located on government-owned property must be secured against unauthorized entry.